Know what is behind every wall.Long after the plaster.
Every capture sits beside the model. Conduits, pipes and slabs are recorded before they are closed in, so after handover you still know what went where, and when.

Why it matters
The snag list was closed. The bathrooms were photographed. Then the leak started.
Drawings, certificates and finished photos do not show what was actually installed behind the walls, or where the site departed from the drawings. Without that record, every defect after handover becomes an argument.



Twin view · 01
What the camera saw.
A 360° capture of the building, taken on site this week by our team.
Twin view · 02
What is behind the wall.
The capture beside the model: slabs, walls, conduits and pipes before the plaster closes them in. After handover, you still know what went where.
Twin view · 03
What needs you today.
Late activities, open snags and claim lines waiting on a signature, pinned to where they are on the building.
01 Photo
02 X-ray
03 Issues
Twin view · the recordings
The capture and the model,from the same angle.
Visualize · what you can do
What you can do.Walked, captured, verified.
What the camera saw
Each floor captured in 360° at every stage of the build.
What is behind the wall
Services and structure recorded before they are closed in.
What needs you today
Late activities, open snags and claim lines pinned to where they are.
A record that outlives the build
Facilities teams find what is behind a wall without opening it.
The result
A record of what was built, not just what was drawn, for handover and every year after.
Questions
About Twin view: behind the wall.
Something else on your mind? Walk through it with us on your own project.
No. Twin view works from the captures and your plans; an IFC model adds the element-by-element view.
Whoever you share it with: your facilities team, the management company or the owners.
Keep exploring
Every part connected.

Visualize
Site walks, before and after
We walk your site with 360° cameras every week. Compare any two dates, from anywhere.

Visualize
Construction progress tracking
Verified progress against the plan and the programme, floor by floor, week by week.

Visualize
Snagging and verified closure
Every snag pinned to the room, owned by a contractor and closed with evidence.